Cement production line
Main Equipment Technical Parameters
Application Field Of Cement Production Line
Our Advantage
1.The vibration is stable and the gap between the bars is adjustable.
2.Optional frequency conversion and speed regulation motor can be used to adjust the frequency and control the feeding amount without frequent starting of the motor.
3.Special grid design to prevent material clogging.
1.Fixed spindle, strong equipment carrying capacity.
2.The intergranular lamination design improves the crushing efficiency.
3.The thin oil lubrication system is designed to improve the service life of the equipment.
1.Simple structure, low manufacturing and use cost.
2.The grinding disc device can be rotated and supported on the body by means of a rotary guide, so that it has a compact structure configuration and reliable work.
3.Reduced downtime reduces equipment usage and maintenance costs.
1. Open calcination, kiln structure is simple, smooth air flow.
2.It can directly calcilate 10~50mm fine-grained limestone, making full use of limestone mine resources.
3. The kiln tail is equipped with an erected preheater to preheat the limestone to the initial decomposition temperature state, reducing the heat consumption per unit product.
1.The ball mill itself operates reliably and can run continuously for a long time.
2.It is suitable for a variety of materials, with large production capacity, which can meet the needs of large-scale production.
3.Sealing work prevents dust from flying, which can reduce the investment and power consumption of exhaust gas treatment.
Company Profile
FAQ
Q: Can I use this production line to produce multi granularity particles? |
Yes, our production line is multifunctional. We can customize ring moulds of different sizes. In this way, you can easily adjust the size of your ball. |
Q: I know little about the fertilizer production line. How to choose the most suitable machine? |
Just tell us your raw materials, capacity (tons / hour) and the size of the final particle product, and we will choose the machine for you according to your specific situation. |
Q: Our workers don't know how to operate the production line. What should I do? |
Our engineers will instruct the site workers on how to install the machines and build the workshop.And field test the production line, training workers how to operate. |
Q: Are you a trading company or a manufacturer? |
We have a large factory in Xinxiang, China, covering an area of 10000 square meters. Welcome to visit. |
Q: What's the Production Period of the Fertilizer Machine? |
For single fertilizer machine, our production time is 7 days;and for whole fertilizer production line, our production time is no more than 30 days. |
Q: What's the Quality Guarantee and Certifications? |
All of our machine have passed ISO and CE certification, we can guarantee the highest quality and our warranty time is 5 years after shipment date. |